A new Tissue Culture!

At the end of 2019, we were getting bigger and were running out of space in our shared TC room. We were lucky that the department agreed to let us have an unused room to redevelop as. a new TC facility. There was some strange things to sort out first - the room was the old radiation room an came complete with a flushing sluice! The next problem was making sure our TC hoods would fit. They made it into the elevator with millimetres (Angstroms?) to spare. But eventually everything was in place, and the room has been in use since the start of 2020.